Ελληνικά :



«ENERBAK»
GEORGANADES, TRIKALA
985,60 ΚWp
General view of the project



Substation
ABB Transformer Medium Voltage Switchgear Panel
Low Voltage Switchgear Panel, view A Low Voltage Switchgear Panel, view Β



Grid connection of the plant







A) STUDY BY NRG-ORION

B) EQUIPMENT PROCUREMENT BY NRG-ORION
SOLON BLUE PV panels 220/16 (220Wp) x 477 pc.+ (225Wp) x 646 pc. + (230Wp) x 3197 pcs.
Support systems by SCHLETTER FS2V.
Inverters by SMA, SMC 11.000TL x 90 pcs.
Recording – communication system by SMA Sunny WebΒox with RS485.
Transformer: ONAN, low losses by ABB.

C) INSTALLATION BY NRG-ORION

D) MONITORING – MAINTENANCE BY NRG-ORION

The project was successfully connected to the grid on November 9th 2011.