- STUDY BY NRG-ORION
- EQUIPMENT PROCUREMENT BY NRG-ORION
- SOLON 476xBLUE 220/03 P/V panels (polycrystalline, 210Wp).
- EXALCO support system, a fixed system made with aluminium and stainless steel joints.
- SMA, 9xSMC10000TL + 1xSB3300TLHC inverters.
- SMA, WEBBOX Recording-communication system.
- INSTALLATION BY NRG-ORION
- MONITORING - MAINTENANCE BY NRG-ORION
The project was connected to the PPC network on 05.09.2008, when the entire project was delivered, together with project “PAMVOTIS 1”. On the basis of the study carried out using the PV-SOL programme of Dr VALENTIN ENERGΙΕSOFTWARE GmbH, this project was expected to deliver 110,056 kWh per year. After 1 full year of operation the P/V plant delivered 146,620.23 kWh i.e. 33.2% more energy than expected.